

Manual Technical Reference Aisys CS2
2069137-001 | |
Anesthesia Delivery | |
G Barco SA | |
GE HealthCare | |
Enter your approval number and submit to add item(s) to cart.
Please enter approval number
OR
Don't know your approval number? Call 800-437-1171
Enter opt 1 for the first three prompts, and have your System ID available.
If you add item(s) to cart and submit your order without the
approval number, GE will contact you before your order
can be confirmed for shipment.
Select your approver's name and submit to add item(s) to your cart
Please Select Approver Name
OR
Don't know your approval number? Call 800-437-1171
Enter opt 1 for the first three prompts, and have your System ID available.
If you add item(s) to cart and submit your order without
selecting an approver, GE will contact you before your order
can be confirmed for shipment.
Features
- Install, operate, diagnose and resolve problem codes, and complete machine repairs and checkouts to comply with all manufacturer recommendations
- Explain the operation of the Aisys CS2 Anesthesia system including the gas delivery, ABS, scavenging system and ventilator
- Demonstrate the ability to locate, identify and explain the functions of the Anesthesia Machine Sub-systems through hands-on labs
- Ability to perform calibrations and adjustments according to the technical reference manual
Product Overview
- The Manual Technical Reference Aisys CS2 is used for Anesthesia Delivery. The manual includes display unit, integral electronics, gas delivery components, electronic vaporization, breathing system components, frame component, auxiliary O2 flowmeter and optional suction regulator. The Aisys CS2 Anesthesia system is a scalable, flexible, and functionally integrated system, featuring advanced design ventilation, respiratory monitoring, and breathing system. It helps with understanding of the operation and configuration of the Anesthesia machine and its ventilator. Hands-on labs are designed to reinforce skills required to understand the operation of the system, removal and replacement of components, loading of system software, troubleshooting using the appropriate tools, completion of the Planned Maintenance inspection and Performance of all calibrations.
Additional Features
- Maintenance procedures and resolve equipment problems